What Happens During a Swimming Pool Renovation?

A Thorough Examination of the Pool

The first stage of all swimming pool renovations is a comprehensive survey. We inspect each part of the pool (structure, pipes, etc.) prior to commencing any renovation works. Common issues can include:

  • Old liners
  • Leaky pipes
  • Damaged coping stones
  • Worn out parts
  • General wear and tear over the years/many freeze/thaw cycles.

Identifying all potential faults prior to starting the renovation will enable us to plan the renovation more efficiently and should stop further faults occurring post renovation.

Removing Faulty Components

After the pool has been drained, old fittings are removed as required. Depending on the condition of the pool, this may involve removing:

  • Skimmers
  • Return inlets
  • Lights
  • Sump
  • Pipes
  • Coping Stones.

Replacing aging components during a scheduled renovation is generally easier than replacing them one at a time as they fail, which will make your pool more reliable and less pricey to maintain.

Installing a New Pool Lining

Click here to see the range of linings

For both concrete and panel pools our commercial lining is ideal in providing enough flexibility to allow for natural movement within older pool structures, whilst producing a durable, watertight surface.

On-site, we cut and tailor each liner to shape before fitting it into place via hot air welding. Once fitted, the welded seams are then sealed with liquid PVC, creating a long lasting strong seal. Our commercial lining offers a high degree of protection against UV light, chemical treatments and algae growth, with no need for curing/drying times.

Our commercial liners are also available in a wide range of premium 3D textured effects that are designed to replicate the authentic look and feel of real ceramic tiles, glass mosaics, natural stone, contemporary concrete and timber surfaces, and are complete with realistic grout lines and textured detailing. All of these exceptional finishes come in an extensive array of colours and patterns, catering to any style and aesthetic.

Finishing the Renovation

The water is then filled back into the pool and all aspects are checked to confirm that each element of the renovation works as it should. While most standard concrete swimming pools can be renovated in approximately 28 days, some will take longer due to the pool’s dimensions and scope of the project.

Renovating your pool is about much more than just changing its look. Replacing aging or failing elements, rejuvenating the pool’s watertight coating, and upgrading outdated mechanical systems will help lengthen the overall lifespan of your pool, while enhancing its performance and reduce maintenance needs for many years.

SERVICES

TESTIMONIALS

Martin and the team have done an excellent job both refurbishing our pool and maintaining it. It used to be a headache but is now easy to run. The team are very knowledgeable and reliable, would definitely recommend to anyone looking to get the most out of their pool.

James Millard, Westerham

I have worked on several projects alongside Martin Clark Swimming Pools and have been very impressed at the quality of their work and attention to detail!

They are friendly and it is easy to tailor your requirements with this family run company.

Helga Pullin, Berrys Green, Kent

Very professional job from start to finish – it is very reassuring that there are still today contractors who deliver on time, deliver what is agreed and provide an after sales service – it’s worth investing in who you know.

Tony Ruddock, Oaklands Garden Design